Risk Management Strategies

Allianz: The Average Business Interruption Claim Is Now About 70% Larger Than the Average Property Damage Claim. Is Your FLOP Sum Insured Built for That?

Allianz Commercial's study of 7,888 business interruption claims, published on 8 October 2026, finds the average BI claim about 70% larger than the average property damage claim. Here is how Indian buyers can stress-test Fire Loss of Profits gross profit, indemnity period and time excess against that data.

Tarun Kumar Singh
Tarun Kumar SinghStrategic Risk & Compliance SpecialistAIII · CRICP · CIAFP
9 min read

Listen to this article

Audio version • 9 min read

business interruptionfire loss of profitindemnity periodsum insured adequacyallianz commercial

Last reviewed: October 2026

What Allianz Commercial actually found

On 8 October 2026, Allianz Commercial published an analysis of 7,888 business interruption (BI) claims worth about EUR 6.74 billion, covering the five years from 2021 to 2025. The headline number is simple and uncomfortable: the average BI claim now exceeds EUR 850,000, against roughly EUR 500,000 for the average property damage claim. On that basis, the average interruption claim is about 70% larger than the average physical damage claim.

Three other findings from the study matter for anyone buying cover in India:

  • The average value of BI claims rose by more than 30% a year over the past two years, while claim frequency stayed broadly stable. Losses are not happening more often. They are getting more expensive each time they happen.
  • Fire and explosion account for more than 40% of BI claim value (about EUR 2.9 billion) and caused nine of the ten costliest man-made BI events in the dataset.
  • Natural catastrophes make up 26% of BI claims by count but 34% by value, which means a nat-cat interruption tends to be larger than the average one.

Allianz also flags that declared values can fall short because of inflation, and recommends that insureds review them regularly. That recommendation is the reason this post exists. The study is a global portfolio, not an Indian one, but the mechanics it describes apply directly to how Indian companies size their Fire Loss of Profits (FLOP) cover.

Why this should worry an Indian FLOP buyer

In the Indian market, business interruption cover for fire and allied perils is usually bought as a FLOP or loss of profits policy that sits alongside the material damage cover under a standard fire policy. Because a FLOP claim only responds if there is an admitted material damage loss, buyers tend to treat it as an add-on. The practical result is a pattern brokers see repeatedly: the property sum insured is built carefully from a fixed asset register and valuation, while the FLOP sum insured is a round number, often a modest fraction of the property figure, carried forward from an earlier year.

The Allianz data cuts against that habit. If the average interruption loss in a large portfolio is meaningfully bigger than the average physical loss, a FLOP sum insured set at a small fraction of the property value is not a conservative estimate. It is a guess that is likely to be wrong in one direction.

There is a second problem. A FLOP policy is indemnity cover, and Indian wordings typically apply average where the sum insured is less than the gross profit that would have been earned over the indemnity period. Under-insurance therefore does not only cap the claim at the sum insured. It can reduce the payout on a partial loss proportionately, so a business that is 40% under-insured can find a smaller claim cut by 40% as well. The full mechanics of how surveyors compute this are set out in our business interruption claims calculation guide.

Fire and nat-cat: the two perils that drive Indian BI value

The study's peril split is unusually relevant to India. Fire and explosion are the largest single source of BI value in the Allianz data, at more than 40%, and natural catastrophes add another 34%. Between them, those two causes account for roughly three quarters of the value in the portfolio.

Fire is also the dominant source of large commercial property losses in India, across chemicals, pharmaceuticals, textiles, warehousing and electronics assembly. A serious fire at a process plant does not just destroy a building. It can take out a reactor train, a utility block or a cleanroom, each of which has its own procurement and commissioning timeline. Our review of listed company fire disclosures shows how often the stated restoration period stretches well past the first estimate given to the exchanges.

Natural catastrophe is the second driver. Flood, cyclone and inundation are covered under the standard Indian fire wordings as named perils, so a FLOP policy will usually respond to them, but the interruption is often longer than a fire of similar physical size because the whole area is affected. Roads, power supply, labour and suppliers are disrupted at the same time.

The Hurricane Helene signal

Allianz notes that many BI claims from Hurricane Helene were still open two years after the event because the affected businesses had not yet recovered. That is a direct comment on indemnity period. A claim that is still running at month 24 has, by definition, outlived a 12-month indemnity period, and the uninsured tail falls on the business.

Stress test 1: rebuild your gross profit figure

The starting point for any FLOP sum insured is gross profit as defined in the policy, not EBITDA and not the gross margin line in the management accounts. Indian FLOP wordings commonly define gross profit as turnover plus closing stock, less opening stock and specified working expenses (the variable costs that stop when production stops). The definition in your own policy wording is the one that matters, so read it before doing the arithmetic.

A practical way to rebuild the figure:

  1. Take the last audited turnover and the specified working expenses defined in the wording, and compute insurable gross profit.
  2. Project it forward to the end of the policy year plus the full length of the indemnity period, using the business plan, not last year's actuals. If the business is growing, the loss will be measured against the growth trajectory.
  3. Apply a buffer for cost inflation. Allianz's observation that declared values fall short because of inflation applies here as much as it does to the property schedule.
  4. Scale the annual figure to the indemnity period. An 18-month indemnity period needs 18 months of projected gross profit, not 12.

If the business has standing charges that would continue during a shutdown (salaries of retained staff, debt service, lease rentals, insurance), check whether they are fully captured in the gross profit basis or need separate treatment. Many Indian buyers discover in the survey that wages were assumed covered and were not, or were covered only for a limited period.

Ask your finance team to sign off the gross profit computation each renewal, with a short note on the projection assumptions. It costs a day of work and gives you a document to put in front of the surveyor if the claim is ever disputed.

Stress test 2: size the indemnity period to a real rebuild

The indemnity period is the variable most often set by habit. Twelve months is a common default in Indian FLOP placements, and for a simple warehouse or office it may be enough. For a plant that depends on imported or long-lead equipment, it frequently is not.

Build the indemnity period from the bottom up, working from the worst credible loss at your largest single location:

  • Time to clear debris, complete the survey and obtain the insurer's consent to rebuild.
  • Time to obtain approvals for reconstruction, including fire NOCs and any pollution control consents that need to be renewed after a major loss.
  • Lead time for critical machinery. Custom reactors, presses, furnaces, transformers and specialised cleanroom systems are frequently quoted on long lead times, and those quotes often get longer after a regional event when many buyers are ordering at once.
  • Commissioning, validation and requalification. In regulated sectors such as pharmaceuticals and food processing, a rebuilt line cannot sell product until it is requalified.
  • Time to win back customers who moved to another supplier during the outage.

The last item is the one most often missed. Revenue does not snap back on the day the plant restarts. The Helene example in the Allianz study, with claims still open after two years, is a reminder that the recovery tail can be longer than the physical rebuild. Where the build-up points to 18 or 24 months, buy that, and size the sum insured to match.

Stress test 3: check the time excess and the dependency gaps

Indian FLOP policies typically apply a time excess, a number of days at the start of the interruption for which no loss is paid. It is a reasonable way to keep premium down, but it should be a deliberate choice. A business with high daily gross profit should calculate what the time excess actually costs it in rupees, and compare that figure with the premium saving it buys.

The bigger gaps often sit outside your own premises:

  • Supplier and customer extensions. A fire at a key supplier's plant can stop your production just as effectively as a fire at your own site. FLOP policies can be extended to named suppliers and customers, usually with a sub-limit. Check whether the sub-limit bears any relation to the dependency.
  • Public utilities. Loss caused by failure of power or water supply to the premises can often be added by extension. For plants on a single grid feeder, this is worth pricing.
  • Prevention of access. Damage near the premises that blocks access, without damaging your own property, is another extension worth reviewing.

Each of these extensions carries its own limits and conditions. The Allianz finding that fire and nat-cat dominate BI value is relevant here too, because both perils routinely damage neighbours and suppliers at the same time as the insured.

What to do before the next renewal

Allianz's core recommendation, regular review of declared values, translates into a short checklist for Indian buyers and their brokers:

  1. Reconcile FLOP to the accounts. Compute insurable gross profit from the last audited statements using your policy's definition, and project it across the policy year plus the indemnity period.
  2. Rebuild the indemnity period from the worst credible loss at your largest location, including equipment lead times, approvals, requalification and customer recovery.
  3. Price the time excess in rupees of lost gross profit and decide whether the premium saving justifies it.
  4. Map dependencies on suppliers, customers and utilities, and check that any extension sub-limits are tied to real exposure.
  5. Review mid-term. If the business has added capacity, launched a product line or raised prices materially, the sum insured may need to be revised before renewal, not after.

For quantification after a loss, our business interruption claim quantification guide walks through the documents surveyors ask for and the points that most often get disputed. The broader risk context for Indian corporates is covered in our note on the Allianz Risk Barometer 2026.

The point of the study for an Indian audience is not that BI is a new risk. It is that the interruption, not the fire, is often the larger loss, and that its cost is rising faster than most renewal processes adjust for. The fire insurance schedule deserves the same scrutiny on its FLOP section as it gets on the material damage side.

About the Author

Tarun Kumar Singh

Tarun Kumar Singh

Strategic Risk & Compliance Specialist

  • AIII
  • CRICP
  • CIAFP
  • Board Advisor, Finexure Consulting
  • Developer of the Behavioural Underinsurance Risk Index (BURI)

Tarun Kumar Singh is a seasoned risk management and insurance professional based in Bengaluru. He serves as Board Advisor at Finexure Consulting, where he advises insurance, fintech, and regulated firms on governance, growth, and trust. His work spans insurance broker regulatory frameworks across India, UAE, and ASEAN, IRDAI compliance and Corporate Agency model reform, VC governance in insurtech, and MSME insurance gap analysis. He is the developer of the Behavioural Underinsurance Risk Index (BURI), a framework applying behavioural economics to underinsurance and insurance fraud risk.

Frequently Asked Questions

How should I set the sum insured on a Fire Loss of Profits policy?
Start from insurable gross profit as your policy wording defines it, usually turnover adjusted for stock movement, less specified working expenses. Project that figure forward across the policy year and the full indemnity period, add a buffer for inflation, and scale it to the length of the indemnity period. Do not set it as a fixed fraction of the property sum insured.
Is a 12-month indemnity period enough?
For a simple warehouse or office it may be. For a plant that relies on long-lead machinery, regulatory approvals or product requalification, it often is not. Build the period from your worst credible loss, including time to win back customers after restart. Allianz notes that many Hurricane Helene BI claims were still open two years after the event.
What happens if my FLOP policy is under-insured?
The claim is capped at the sum insured, and if the policy applies average, a partial loss can also be reduced in proportion to the shortfall. A business that is significantly under-insured can therefore lose part of even a modest claim, not only the top end of a large one.
Does the Allianz study apply to Indian businesses?
The dataset is Allianz Commercial's global BI claims portfolio, not an India-specific sample, so the exact averages should not be read as Indian figures. The mechanics carry over directly: fire and natural catastrophe are the leading BI causes, claim values are rising faster than frequency, and inflation erodes declared values that are not reviewed.

Related Glossary Terms

Related Insurance Types

Related Industries

Related Articles

Sarvada Intelligence

Ready to see Sarvada in action?

Explore the platform workflow or start a product conversation with our underwriting automation team.

Explore the platform